18.0 SERVICE AND MAINTENANCE

During the Defects Liability Period the Electrical Contractor shall be responsible for the service and maintenance work for the complete installation. All works shall be carried out by competent personnel. All labour material, tools and parts necessary to rectify the defects due to manufacturing/installation faults shall be supplied/executed at the Electrical Contractor’s cost. The service and maintenance to be performed shall include but not be limited to the following :-
(a) Replacing or making good all components of that ransformer and ancillary equipment etc.
(b) Replacing and making good all loose and burnt cables and terminations, all mechanical support and linkage, earth electrodes, earth electrode chambers and covers, conduits trunkings etc.
(c) Making good any damage to roads, buildings, drains cables, pipes, concrete areas, paved areas etc. which had not been properly made good arising out of his work.
(d) All other works as deemed necessary by the S.O.
All works shall be carried out as soon as the Electrical

Contractor has been informed by the S.O. or the occupant and shall be completed within a reasonable time except under Additional
General Conditions. If the Electrical Contractor fails to comply with the above requirement, the S.O. reserves the right to engage another party to carry out the works, in which case the Electrical Contractor shall be responsiblefor all the expenses incurred.

 

 

17.0 AS INSTALLED DRAWINGS MANUALS AND TOOLS

The drawings, manuals, tools etc. as mentioned below shall be
provided whether or not they are separately itemised in the Bill
Of Qualities of the Tender Document. The cost of all these
drawings, manuals, tools, etc. is deemed to be included in the
Tender Price.

 

17.1 AS INSTALLED DRAWINGS

Within three calendar months after the practical completion of the