CABLE ROUTES

image_pdfimage_print

Cable routes shown in the Drawings are for tendering purpose only. The Electrical Contractor shall submit shop drawings as required in 13.1 of the proposed routes and peg out the cable routes for the approval of the S.O.’s Representative prior to excavation of the cable trenches. The program of work for excavation of cable trenches, laying of cables, reinstatement of trenches etc. shall be submitted to the S.O.’s Representative for approval one week before execution of the work.
The Electrical Contractor shall make available all necessary insurance or guarantee, and shall also ensure all approvals are obtained from relevant authorities prior to commencing works. The Electrical Contractor shall be responsible in making good any damage to buildings, tarmacs, pavements, concrete areas, slopes, drains, culverts, pipes etc. which had not been properly make good arising out of his work.